

Nike Epic Backpack / Nike Inc. – Boblbee project.
Final product with injected bio-kinetic frame.
Project team Nike: Michael Collier (project lead), Martha Moore, Thomas Bell, Frank Braun, Phil Frank,
Peter Ruppe (Product Director ).
Photo: Nike Inc.©


Nike Epic Backpack / Nike Inc. – Boblbee project.
Brainstorming tooling and component design.
Project team Nike: Michael Collier (project lead), Martha Moore, Thomas Bell, Frank Braun, Phil Frank, Peter Ruppe (Product Director ).


Nike Epic Backpack / Nike Inc. – Boblbee project.
Initial CAD of frame development.
Project team Nike: Michael Collier (project lead), Martha Moore, Thomas Bell, Frank Braun, Phil Frank, Peter Ruppe (Product Director ).


Nike Epic Backpack / Nike Inc. – Boblbee project.
Initial CAD of lumbar support.
Project team Nike: Michael Collier (project lead), Martha Moore, Thomas Bell, Frank Braun, Phil Frank, Peter Ruppe (Product Director ).


Nike Epic Backpack / Nike Inc. – Boblbee project.
Virtual parts analysis prior to tooling.
Project team Nike: Michael Collier (project lead), Martha Moore, Thomas Bell, Frank Braun, Phil Frank, Peter Ruppe (Product Director ).


Nike Epic Backpack / Nike Inc. – Boblbee project.
Virtual parts analysis prior to tooling.
Project team Nike: Michael Collier (project lead), Martha Moore, Thomas Bell, Frank Braun, Phil Frank, Peter Ruppe (Product Director ).


Nike Epic Backpack / Nike Inc. – Boblbee project.
3D printed prototype parts.
Project team Nike: Michael Collier (project lead), Martha Moore, Thomas Bell, Frank Braun, Phil Frank, Peter Ruppe (Product Director ).


Nike Epic Backpack / Nike Inc. – Boblbee project.
Jonas Blanking with Michael Collier/Nike Inc.
Project team Nike: Michael Collier (project lead), Martha Moore, Thomas Bell, Frank Braun, Phil Frank, Peter Ruppe (Product Director ).